Lift Replacement - Hazel Court
Bernicia Group
- Value
- £0
- Published
- 29 Sept 2026
- Deadline
- 16 Oct 2026
- Procedure
- Below threshold - open competition
- Category
- 45313100 — Lift installation work
- Location
- UKC22, United Kingdom
- Notice reference
- 091989-2026
Requirements summary
Bernicia Group is procuring a contractor to remove and dispose of an existing lift at Hazel Court and install a new Machine Room-Less (MRL) traction lift, including testing, commissioning and certification. The works may also include associated builders', electrical and finishing work, operation and maintenance manuals, staff training, warranties and defects liability support. The contract period runs from 1 November 2026 to 31 March 2027, with tenders due by 16 October 2026.
Key requirements
- Decommission and safely remove the existing lift installation and dispose of the old equipment
- Supply, install, test, commission and certify a new MRL traction lift system with mechanical, electrical, control and safety components
- Ensure compliance with current statutory requirements, relevant British Standards and industry best practice
- Provide operation and maintenance manuals, staff training, warranties and defects liability support
- Possible associated builders', electrical and finishing works to enable installation and operation
- Contract period 1 November 2026 to 31 March 2027; tender deadline 16 October 2026 at 12:00 UK time via the in-tendhost portal
Similar open notices
- EDC/2026/4397 Lift Refurbishment Milngavie Enterprise CentreEast Dunbartonshire Council
- Framework for the Supply and Installation of Accessibility Equipment and Independent Living AdaptationsSUNDERLAND CARE AND SUPPORT LIMITED
- TEC Partnership - Replacement of Lift Gear at East Riding College BridlingtonTEC Partnership