BCU-ITT-64220 - Substation 4 Switchgear Upgrade -WMH
Betsi Cadwaladr University Health Board
- Value
- £1,140,000
- Published
- 9 Oct 2026
- Deadline
- 20 Nov 2026
- Procedure
- Below threshold - open competition
- Category
- 45000000 — Construction work; 71000000 — Architectural, construction, engineering and inspection services
- Location
- UKL23, United Kingdom
- Notice reference
- 095754-2026
Requirements summary
Betsi Cadwaladr University Health Board is procuring a qualified electrical engineering contractor to phase in the replacement and upgrade of the Low Voltage switchgear in Substation 4 at Wrexham Maelor Hospital. The work supports the Nucleus Phase 1 programme and aims to improve the resilience, reliability and operational flexibility of the hospital's electrical distribution network. The estimated value is GBP 1,140,000 gross (GBP 950,000 net), with a contract period from 22 January 2027 to 21 January 2028.
Key requirements
- Electrical engineering contractor to replace and upgrade LV switchgear in Substation 4, Wrexham Maelor Hospital
- Phased delivery of works as part of the Nucleus Phase 1 programme
- Mandatory site visit; failure to attend may result in disqualification
- Contract to be let under a JCT Intermediate Building Contract
- Award based on 40% technical quality and 60% commercial cost
- Tender closes 20 November 2026 at 12:00; late submissions will not be considered
- Contract period 22 January 2027 to 21 January 2028; SME and VCSE bidders eligible