Upper Thurne Package 3 Construction Works

Broads (2006) Internal Drainage Board

Value
£7,800,000
Published
16 Oct 2026
Deadline
19 Jan 2027
Procedure
Competitive flexible procedure
Category
45232150 — Works related to water-distribution pipelines; 45232152 — Pumping station construction work; 45240000 — Construction work for water projects; 45252120 — Water-treatment plant construction work; 45310000 — Electrical installation work; 45351000 — Mechanical engineering installation works; 71320000 — Engineering design services
Location
UKH1, United Kingdom
Notice reference
098197-2026

Requirements summary

Broads (2006) Internal Drainage Board, overseen by the Water Management Alliance with Turner & Townsend as advisors, is procuring a single contractor to design and build two pumping stations (Horse Fen and Somerton South) and one culvert (Somerton culvert) in the UK. Existing assets at each site must be decommissioned, and the contract runs from April 2027 to November 2028 with an estimated gross value of GBP 7.8m (GBP 6.5m net).

Key requirements

  • Design and construction contractor for 2 pumping stations (Horse Fen, Somerton South) and one culvert (Somerton culvert)
  • Decommissioning of existing assets at each site
  • Design scope includes telemetry, HMI/functional design specification, sensors and monitoring, stop logs, valves, penstocks, flow meters, precast concrete components, MCC and full electrical design, and HVAC/fire/intruder-alarm control kios…
  • Temporary works plus licences, permissions and consents
  • Minimum of 3 comparable contracts, including water-industry works and NEC works contract experience
  • Environmental management (ISO14001) and quality management (ISO9001), or evidence of strong equivalent systems; supply chain payment within 30 days
Upper Thurne Package 3 Construction Works — Broads (200… | ProposAI