Retrofit Installation of Fin Stabiliser Systems on MV Isle of Mull and MV Lord of the Isles
CalMac Ferries Limited
- Value
- Not stated
- Published
- 13 Nov 2026
- Deadline
- Not stated
- Procedure
- Not stated
- Category
- 50240000 — Repair, maintenance and associated services related to marine and other equipment
- Location
- UK
- Notice reference
- 107251-2026
Requirements summary
CalMac Ferries Limited is running a planned pre-market engagement (PIN) to investigate retrofit options for replacing fin stabiliser systems on MV Isle of Mull and MV Lord of the Isles, whose existing Rolls-Royce Letter A Crux vane units are no longer OEM-supported. Suppliers are invited to provide concepts and feedback covering design, supply, installation, commissioning, five-year support, control system compatibility, timelines, out-of-service duration and indicative budgets; feedback is requested by 11 December 2026 and issuing the notice does not commit CFL to a procurement.
Key requirements
- Design support, engineering assessment and installation planning for fin stabiliser retrofit on two named vessels
- Removal and replacement of fin box arrangements, including structural modifications and hull plating works
- Supply and installation of new fin stabiliser systems, hydraulic systems and power units suitable for ferry operations
- Replacement or compatible control systems and software for MV Lord of the Isles (current software dates from 2014) and MV Isle of Mull (ECO Control, installed 2023)
- Support for minimum five years after installation, including OEM-trained personnel, aftersales, maintenance and spares
- Market feedback on timelines, vessel out-of-service duration, indicative budget, classification society approval route and standardisation across both vessels