Retrofit Installation of Fin Stabiliser Systems on MV Isle of Mull and MV Lord of the Isles

CalMac Ferries Limited

Value
Not stated
Published
13 Nov 2026
Deadline
Not stated
Procedure
Not stated
Category
50240000 — Repair, maintenance and associated services related to marine and other equipment
Location
UK
Notice reference
107251-2026

Requirements summary

CalMac Ferries Limited is running a planned pre-market engagement (PIN) to investigate retrofit options for replacing fin stabiliser systems on MV Isle of Mull and MV Lord of the Isles, whose existing Rolls-Royce Letter A Crux vane units are no longer OEM-supported. Suppliers are invited to provide concepts and feedback covering design, supply, installation, commissioning, five-year support, control system compatibility, timelines, out-of-service duration and indicative budgets; feedback is requested by 11 December 2026 and issuing the notice does not commit CFL to a procurement.

Key requirements

  • Design support, engineering assessment and installation planning for fin stabiliser retrofit on two named vessels
  • Removal and replacement of fin box arrangements, including structural modifications and hull plating works
  • Supply and installation of new fin stabiliser systems, hydraulic systems and power units suitable for ferry operations
  • Replacement or compatible control systems and software for MV Lord of the Isles (current software dates from 2014) and MV Isle of Mull (ECO Control, installed 2023)
  • Support for minimum five years after installation, including OEM-trained personnel, aftersales, maintenance and spares
  • Market feedback on timelines, vessel out-of-service duration, indicative budget, classification society approval route and standardisation across both vessels