Devon and Somerset Fire and Rescue Authority is running a preliminary market engagement (PME) for converting two existing training buildings at Plympton and Taunton Fire Stations into gas-fired live-fire training facilities. Work covers building repairs, heat protection, gas rigs, electrical, ventilation, smoke, monitoring and controls, testing, commissioning and support, with both sites required to be operational by December 2027. The route to market is undecided and a two-stage arrangement is under consideration.

Key requirements

  • Principal Contractor or specialist gas-rig subcontractor to convert two existing training buildings (Plympton and Taunton) into gas-fired training facilities
  • Gas-rig design and installation including burners, gas distribution, ignition, flame supervision, emergency shutdown and instructor controls
  • Building surveys, concrete, steelwork and roof repairs, and refractory or heat-resistant protection for repeated high-temperature use
  • Electrical, mechanical, ventilation, emergency smoke extraction, artificial smoke, temperature monitoring and alarm systems
  • Integrated testing, commissioning, instructor familiarisation, servicing, spare parts and ongoing support
  • Both initial sites commissioned and operational by December 2027; further site possible but unconfirmed