Blackdown Hills National Landscape Green Finance Accelerator - Floodplain reconnection outline designs, Weir Modifications and high risk water quality outfalls
Devon County Council
- Value
- £588,000
- Published
- 5 Nov 2026
- Deadline
- 30 Nov 2026
- Procedure
- Open procedure
- Category
- 50116000 — Maintenance and repair services related to specific parts of vehicles; 77000000 — Agricultural, forestry, horticultural, aquacultural and apicultural services
- Location
- UK, United Kingdom
- Notice reference
- 105284-2026
Requirements summary
Devon County Council is procuring specialist consultancy across three lots under the Blackdown Hills National Landscape Green Finance Accelerator: detailed design for two weir modifications on the River Wolf, flood risk assessment and detailed design for flood resilience at the Hele Railway Crossing at three sites, and specialist water quality outfall consultancy in South West England. The total estimated value is GBP 490,000 excluding VAT (GBP 588,000 gross), with contracts running from 4 January 2027 to 31 March 2027 and an open-procedure tender deadline of 30 November 2026.
Key requirements
- Detailed design for two weir modifications on the River Wolf: Marles weir (near Awliscombe, Honiton) and Weston weir (Heron's farm, near Honiton), working with the BHNL team
- Flood Risk Assessment preparation and progression to detailed design to improve flood resilience at the Hele Railway Crossing on the western mainline at three sites (Smithincott Extension, Spratcot Cullompton, Sheldon Catchment)
- Specialist consultants for a water quality outfall capital project overseen by a Project Steering Group, covering South West England excluding Gloucestershire and Bath/Bristol
- Bidders may bid for one, two or all three lots, with no limit on the number or value of lots awarded
- Award weighted 80% quality and 20% price; SME suitability indicated for all lots
- Contract period 4 January 2027 to 31 March 2027; tender deadline 30 November 2026 at 12:00 UTC