IT Infrastructure Framework

Dover Harbour Board

Value
£0
Published
27 Aug 2026
Deadline
Not stated
Procedure
Competitive flexible procedure
Category
45314000 — Installation of telecommunications equipment; 45310000 — Electrical installation work; 45314300 — Installation of cable infrastructure; 35125300 — Security cameras; 45222300 — Engineering work for security installations; 50333000 — Maintenance services of radio-communications equipment; 45312330 — Radio aerial installation work; 38115100 — Radar surveillance equipment; 38115000 — Radar apparatus; 38100000 — Navigational and meteorological instruments; 42961100 — Access control system; 50610000 — Repair and maintenance services of security equipment
Location
UKJ44, United Kingdom
Notice reference
081707-2026

Requirements summary

Dover Harbour Board is establishing a closed IT Infrastructure Framework with four lots covering access control, CCTV, data cabling and infrastructure, and radio infrastructure. The framework runs from 1 January 2027 to 1 January 2030, with delivery in the UKJ44 region, and is procured through a competitive flexible procedure with award based on 40% quality and 60% price. The notice lists a value of GBP 0, so no contract value is stated.

Key requirements

  • Install, test, commission, maintain and repair access control infrastructure, including shielded-pair, magnetic-lock and reader cabling, door-release devices, break-glass units and readers
  • Supply, install, terminate, test and commission CCTV cabling and hardware, including interfacing with existing FLIR/DVTEL IP CCTV, ANPR and standalone digital CCTV systems
  • Supply, install, repair, test and maintain data cabling such as fibre optic, CAT6a and signalling cabling
  • Install, test, commission, maintain and repair trunked radio systems (including Motorola), radar systems, vessel-mounted navigational aids and meteorological sensors
  • Framework contract period from 1 January 2027 to 1 January 2030, delivered in the UKJ44 region (Dover, Kent)
  • Expressions of interest due by 25 September 2026; award period ends 25 November 2026
  • Competitive flexible procedure with 40% quality and 60% price weighting; each lot requires a minimum of one candidate at the second stage