Early Works – Civils, Infrastructure, Buildings & MEP and Earthworks

Great British Energy - Nuclear

Value
£0
Published
19 Aug 2026
Deadline
Not stated
Procedure
Competitive flexible procedure
Category
45000000 — Construction work; 45100000 — Site preparation work; 45200000 — Works for complete or part construction and civil engineering work; 45220000 — Engineering works and construction works; 43000000 — Machinery for mining, quarrying, construction equipment; 44000000 — Construction structures and materials; auxiliary products to construction (except electric apparatus); 71000000 — Architectural, construction, engineering and inspection services
Location
UK, United Kingdom
Notice reference
079214-2026

Requirements summary

Great British Energy - Nuclear is planning an Early Works package covering civils, infrastructure, buildings, MEP and earthworks to prepare a site for main nuclear construction. The scope includes RIBA Stage 4 design and delivery of enabling activities such as species relocation, remediation, site clearance, construction utilities, drainage and haul roads. The notice gives an indicative contract value range of £730m-£1,100m, although the structured value field is recorded as £0.

Key requirements

  • Design (from RIBA Stage 4) and delivery of early works enabling activities for a nuclear site
  • Species relocation, remediation, site clearance and site establishment
  • Construction utilities, drainage and haul roads to support bulk earthworks
  • Single consolidated package combining civils and earthworks to minimise interface risk
  • Indicative contract value £730m-£1,100m; contract period June 2028 to June 2034, with a possible extension to June 2037
  • Lot flagged as suitable for SMEs; delivery in the United Kingdom