HS2 Residual Works Framework
High Speed Two (HS2) Limited
- Value
- £2,640,000,000
- Published
- 26 Aug 2026
- Deadline
- Not stated
- Procedure
- Competitive flexible procedure
- Category
- 45000000 — Construction work; 71320000 — Engineering design services
- Location
- UK, United Kingdom
- Notice reference
- 081473-2026
Requirements summary
High Speed Two (HS2) Limited is planning a competitive flexible procedure framework for ongoing residual works and associated activities along the Phase 1 route from London Euston to Handsacre, including the Birmingham Curzon Street spur. The framework covers civil, environmental and specialist and ancillary capabilities, delivered as packages, including emerging and currently unknown scope. The notice gives a gross value of GBP 2.64bn (net GBP 2.2bn) and a contract period from 9 March 2029 to 9 March 2039.
Key requirements
- Capability-led framework for residual works along Phase 1 line of route, London Euston to Handsacre, including Birmingham Curzon Street spur
- Capabilities across Highways, Structures, Utilities, Drainage, Earthworks, Landscaping, Ecology, Heritage, Environmental, Civil Design, Surveys and Site Investigations, Temporary Works, Demolition, Fencing, MEP, and Specialist & Ancillary…
- Delivery of works in packages, with single or multiple capabilities per package
- Flexibility to respond to emerging, urgent and currently unknown scope over the framework term
- Typical activities include highway schemes, permanent works, infrastructure completion, land restoration, mitigations, handback, design completion, validations and consents
- Framework value of GBP 2.64bn gross (GBP 2.2bn net), contract period 2029-2039
- Lot suitable for SMEs and VCSEs; UK delivery