North Wooton Pump and Pre-Cast Concrete Units Supply

Kings Lynn Internal Drainage Board

Value
£468,000
Published
9 Oct 2026
Deadline
3 Nov 2026
Procedure
Competitive flexible procedure
Category
42122000 — Pumps; 44114200 — Concrete products
Location
UKH1, United Kingdom
Notice reference
095771-2026

Requirements summary

King's Lynn Internal Drainage Board is procuring the design, manufacture, supply and delivery of two eel- and fish-friendly pumps and pre-cast concrete units forming the pump sump, support and inlet structure for the North Wootton pumping station replacement. The estimated value is about GBP 390,000 excluding VAT (GBP 468,000 gross), with a contract period from 19 November 2026 to 15 September 2027 and delivery within the UKH1 region.

Key requirements

  • Design, manufacture, supply and delivery of two pumps for North Wootton pumping station
  • Supply of pre-cast concrete units (PCCU) forming pump sump, support and inlet structure
  • Pumps must provide Best Achievable Eel Protection (BAEP) and safe fish/eel passage
  • High efficiency, low maintenance pumps with broad flow rate range at design heads
  • Testing and provision of Health and Safety File and Operations and Maintenance Manual information
  • Tender submissions due 3 November 2026; contract period 19 November 2026 to 15 September 2027