Closed
North Wooton Pump and Pre-Cast Concrete Units Supply
Kings Lynn Internal Drainage Board
- Value
- £468,000
- Published
- 9 Oct 2026
- Deadline
- 3 Nov 2026
- Procedure
- Competitive flexible procedure
- Category
- 42122000 — Pumps; 44114200 — Concrete products
- Location
- UKH1, United Kingdom
- Notice reference
- 095771-2026
Requirements summary
King's Lynn Internal Drainage Board is procuring the design, manufacture, supply and delivery of two eel- and fish-friendly pumps and pre-cast concrete units forming the pump sump, support and inlet structure for the North Wootton pumping station replacement. The estimated value is about GBP 390,000 excluding VAT (GBP 468,000 gross), with a contract period from 19 November 2026 to 15 September 2027 and delivery within the UKH1 region.
Key requirements
- Design, manufacture, supply and delivery of two pumps for North Wootton pumping station
- Supply of pre-cast concrete units (PCCU) forming pump sump, support and inlet structure
- Pumps must provide Best Achievable Eel Protection (BAEP) and safe fish/eel passage
- High efficiency, low maintenance pumps with broad flow rate range at design heads
- Testing and provision of Health and Safety File and Operations and Maintenance Manual information
- Tender submissions due 3 November 2026; contract period 19 November 2026 to 15 September 2027
Similar open notices
- Vacuum Pump Tritium TestingUK Atomic Energy Authority
- St Edmunds College Water Waste and Pump Service ContractST EDMUND'S COLLEGE CAMBRIDGE
- Exhaust Detritiation SystemUK Atomic Energy Authority