Closed

North Wooton Pump and Pre-Cast Concrete Units Supply

Kings Lynn Internal Drainage Board

Value
£468,000
Published
18 Sept 2026
Deadline
20 Oct 2026
Procedure
Competitive flexible procedure
Category
42122000 — Pumps; 44114200 — Concrete products
Location
UKH1, United Kingdom
Notice reference
088613-2026

Requirements summary

Kings Lynn Internal Drainage Board, overseen by the Water Management Alliance with Turner & Townsend as advisors, is procuring the design, manufacture, supply and delivery of two pumps and pre-cast concrete units for the North Wootton pumping station replacement. The pre-cast units form the pump sump, support and inlet structure. The estimated value is about GBP 390,000 excluding VAT (GBP 468,000 gross), with a planned contract period from November 2026 to September 2027.

Key requirements

  • Design, manufacture, supply and delivery of two pumps for the North Wootton pumping station
  • Supply of pre-cast concrete units forming the pump sump, support and inlet structure
  • Pumps with high efficiency, low maintenance and a broad range of flow rates at design heads
  • Best Achievable Eel Protection (BAEP) providing safe fish and eel passage and reducing fish injury and killing
  • Design testing and provision of Health and Safety File and Operations and Maintenance Manual information
  • Competitive flexible procedure with tender deadline 20 October 2026; delivery in the UK (UKH1)

Similar open notices

North Wooton Pump and Pre-Cast Concrete Units Supply —… | ProposAI