Closed
North Wooton Pump and Pre-Cast Concrete Units Supply
Kings Lynn Internal Drainage Board
- Value
- £468,000
- Published
- 18 Sept 2026
- Deadline
- 20 Oct 2026
- Procedure
- Competitive flexible procedure
- Category
- 42122000 — Pumps; 44114200 — Concrete products
- Location
- UKH1, United Kingdom
- Notice reference
- 088613-2026
Requirements summary
Kings Lynn Internal Drainage Board, overseen by the Water Management Alliance with Turner & Townsend as advisors, is procuring the design, manufacture, supply and delivery of two pumps and pre-cast concrete units for the North Wootton pumping station replacement. The pre-cast units form the pump sump, support and inlet structure. The estimated value is about GBP 390,000 excluding VAT (GBP 468,000 gross), with a planned contract period from November 2026 to September 2027.
Key requirements
- Design, manufacture, supply and delivery of two pumps for the North Wootton pumping station
- Supply of pre-cast concrete units forming the pump sump, support and inlet structure
- Pumps with high efficiency, low maintenance and a broad range of flow rates at design heads
- Best Achievable Eel Protection (BAEP) providing safe fish and eel passage and reducing fish injury and killing
- Design testing and provision of Health and Safety File and Operations and Maintenance Manual information
- Competitive flexible procedure with tender deadline 20 October 2026; delivery in the UK (UKH1)
Similar open notices
- Vacuum Pump Tritium TestingUK Atomic Energy Authority
- St Edmunds College Water Waste and Pump Service ContractST EDMUND'S COLLEGE CAMBRIDGE
- Exhaust Detritiation SystemUK Atomic Energy Authority