Hounslow Heat Network

London Borough of Hounslow

Value
£500,000,000
Published
3 Nov 2026
Deadline
4 Dec 2026
Procedure
Not stated
Category
09320000 — Steam, hot water and associated products; 42160000 — Boiler installations; 42511110 — Heat pumps; 44622000 — Heat-recovery systems; 45232140 — District-heating mains construction work; 45232141 — Heating works; 45232142 — Heat-transfer station construction work; 45251250 — District-heating plant construction work; 45259300 — Heating-plant repair and maintenance work; 45331000 — Heating, ventilation and air-conditioning installation work; 50720000 — Repair and maintenance services of central heating; 65400000 — Other sources of energy supplies and distribution
Location
UKI75, United Kingdom
Notice reference
104403-2026

Requirements summary

The London Borough of Hounslow is running a preliminary market engagement ahead of a planned Spring 2027 procurement to select a Heat Network Development Partner to fund, build and operate a borough-wide district heating network, to be delivered in phases. The first phase is an anchor scheme using heat recovery from Thames Water's Mogden Waste Water Treatment Works, serving West Middlesex University Hospital and Council-owned assets, with a planned partnership via a Joint Venture with Golden Share. The notice lists an estimated value of GBP 500,000,000, a contract period from 2028 to 2032 with a maximum extent to 2040, and the procurement is expected to use the competitive flexible procedure under the Procurement Act 2023.

Key requirements

  • Heat Network Development Partner to fund, develop, construct and operate a district heating network across Hounslow
  • Full build-out to supply 484 GWh annual heat demand through a 69 km network
  • Phase 1 reference scheme: 45 GWh annual heat demand via 9.57 km network with anchor loads including West Middlesex University Hospital and Council-owned assets
  • Heat recovery from Thames Water's Mogden Waste Water Treatment Works as anchor heat source
  • Experience in heat network development, financing, construction and operation; ability to bring capital and delivery capability
  • Joint Venture structure with Golden Share; consortia and SMEs/VCSEs welcome
Hounslow Heat Network — London Borough of Hounslow | ProposAI