EV Charging Infrastructure

NATIONAL GRID UK LIMITED

Value
£29,850,000
Published
30 Sept 2026
Deadline
Not stated
Procedure
Competitive flexible procedure
Category
31158000 — Chargers; 50111000 — Fleet management, repair and maintenance services; 50116000 — Maintenance and repair services related to specific parts of vehicles
Location
UKC, United Kingdom
Notice reference
092320-2026

Requirements summary

National Grid UK Limited is procuring EV charging infrastructure for its vehicles and users across substation and office sites, through a competitive flexible procedure with a total value of GBP 29.85m across three lots. Lot 1 covers supply, installation and commissioning of AC and DC chargers (GBP 21.15m), Lot 2 covers mobile DC chargers (GBP 3.7m), and Lot 3 covers a system operating platform and maintenance (GBP 5m). The contract period runs from 30 June 2027 to 30 June 2032, with three one-year extension options up to 2035.

Key requirements

  • Supply, installation and commissioning of AC and DC EV chargers at National Grid sites (Lot 1, GBP 21.15m)
  • Mobile DC chargers that can be transported and repositioned between locations (Lot 2, GBP 3.7m)
  • System operating platform with scheduled, planned and ad hoc maintenance for connectivity, payments, user support and MI/reporting (Lot 3, GBP 5m)
  • Contract period from 30 June 2027 to 30 June 2032, with three 1-year extension options to 2035
  • Delivery addresses listed in UK regions UKC to UKL; Scotland and Northern Ireland regions are not listed
  • Awards weighted 65% technical and 35% commercial; supplier selection is pass/fail against PQQ mandatory requirements