Closed
Integral Bridge Research
National Highways Limited
- Value
- £360,000
- Published
- 5 Aug 2026
- Deadline
- 31 Aug 2026
- Procedure
- Not stated
- Category
- 73111000 — Research laboratory services
- Location
- UK, United Kingdom
- Notice reference
- 074140-2026
Requirements summary
National Highways, the strategic highways authority for England's Strategic Road Network, is running a preliminary market engagement to explore a controlled laboratory testing environment with a scaled physical model of the Wisley Interchange integral bridge. The work is intended to study structural-soil interaction and settlement, stress and strain behaviour, complementing the existing 116-sensor live field trial and informing possible future updates to PD 6694-1. The estimated value is GBP 300,000 net (GBP 360,000 gross), with a contract period from 2027-01-04 to 2029-03-31.
Key requirements
- Design, construction or testing of a scaled physical model of the Wisley Interchange integral bridge for controlled structural-soil interaction studies
- Laboratory-based physical testing capability to investigate settlement, stress and strain behaviour
- Instrumentation, sensing and monitoring capability, including integrating laboratory and field data from the 116-sensor live trial
- Advanced modelling, analytics or digital frameworks to interpret structural and geotechnical behaviour
- Evidence of experience supporting design guidance, standards development (PD 6694-1) or asset management decisions
- Response via preliminary market engagement feedback form by 2026-08-31; SME and VCSE organisations eligible
Similar open notices
- In-Vitro Diagnostics, Point of Care Testing & Pathology Services Project_1717SUPPLY CHAIN COORDINATION LIMITED
- In-Vitro Diagnostics, Point of Care Testing & Pathology ServicesSUPPLY CHAIN COORDINATION LIMITED
- STEP Engineering System Partners ProcurementUK Fusion Energy Ltd
- National Highways - Cost Estimating Framework (2028-2032)National Highways Limited