Closed

Strategic Charging Infrastructure Scheme

National Highways Limited

Value
£190,000,000
Published
28 Sept 2026
Deadline
30 Oct 2026
Procedure
Not stated
Category
45317300 — Electrical installation work of electrical distribution apparatus; 45310000 — Electrical installation work; 45220000 — Engineering works and construction works; 71322000 — Engineering design services for the construction of civil engineering works
Location
UKC, United Kingdom
Notice reference
091618-2026

Requirements summary

National Highways Limited, working with the Office for Zero Emission Vehicles, is running a planning-stage Strategic Charging Infrastructure (SCI) Scheme to strengthen electricity network capacity at selected motorway service areas in England. The indicative value is GBP 190 million (GBP 158.3m net), covering electrical installation, engineering works, and design services, with possible enabling civils works such as land preparation and substation housing. This notice is a preliminary market engagement, not a formal tender, and the questionnaire closes 30 October 2026.

Key requirements

  • Strengthen electricity network capacity at selected motorway service areas in England
  • Electrical installation work on electricity distribution apparatus and general electrical installation
  • Engineering and construction works, plus engineering design services for civil works
  • Possible enabling civils such as land preparation and substation housing to meet adoption and connection standards
  • Support an open-access EV charging network usable by any manufacturer's vehicles
  • Contract period from 1 July 2027 to 31 May 2028; indicative budget GBP 190 million
  • Interested suppliers to complete pre-market engagement questionnaire by 30 October 2026