UK1 - Pipeline Notice - A27 Arundel Railway Bridge Replacement
National Highways Limited
- Value
- Not stated
- Published
- 1 Oct 2026
- Deadline
- Not stated
- Procedure
- Not stated
- Category
- 45233100 — Construction work for highways, roads; 45000000 — Construction work
- Location
- UK, United Kingdom
- Notice reference
- 092991-2026
Requirements summary
National Highways Limited plans to procure a design and build partner to replace the existing railway bridge on the A27 at Arundel, aiming to improve its condition, resilience and long-term performance. The scheme is intended to keep the route safe and reliable for road users while reducing future maintenance and disruption to the strategic road network. The notice is a planned pipeline notice with a contract period from 2030 to 2033 and delivery in the United Kingdom.
Key requirements
- Design and build partner to replace the A27 Arundel railway bridge structure
- Improve bridge condition, resilience and long-term performance on a key A27 section
- Maintain safe and reliable route for road users during and after works
- Minimise future maintenance requirements and disruption to the strategic road network
- Contract period from 30 June 2030 (start) to 30 June 2033 (end) per lot data
- Delivery location: United Kingdom (Arundel, A27)