Energy Recovery Facility Construction Works for the North London Heat & Power Project ("NLHPP") - Agreement dated 24 January 2022 as previously amended by Variation Agreement No. 1 dated 27 June 2023 and Variation Agreement No. 2 dated 26 July 2026. It is proposed to further amend the Contract by way of a draft Settlement and Variation Agreement No. 3 intended to be signed on 14 December 2026

North London Waste Authority

Value
Not stated
Published
15 Nov 2026
Deadline
Not stated
Procedure
Award procedure without prior publication of a call for competition
Category
42320000 — Waste incinerators; 45200000 — Works for complete or part construction and civil engineering work; 51135110 — Installation services of waste incinerators
Location
UKI54
Notice reference
108246-2026

Requirements summary

North London Waste Authority is amending its existing contract with Acciona Industrial S.A. for the design, procurement, construction, commissioning and testing of the Energy Recovery Facility at Edmonton EcoPark, London, including buildings, utilities, landscaping and operator training. The notice covers a proposed Settlement and Variation Agreement No. 3 to modify a contract already partly completed and previously varied twice, with an award recorded at GBP 1.25 billion. The award was made without prior publication of a call for competition, justified under reg. 99(4)(c) of the Public Contracts Regulations 2015.

Key requirements

  • Design, procurement, construction, commissioning and testing of an Energy Recovery Facility at Edmonton EcoPark, N18 3AG
  • Two identical process lines with moving grate combustion, heat recovery boiler, SCR flue gas treatment and common turbine-generator system
  • Associated civil engineering, buildings, utilities connections, landscaping, weighbridges, workshops, offices and wastewater treatment works
  • Operator training and handover of the new facility
  • Compliance with CDM Regulations 2015 with Principal Contractor and Principal Designer roles
  • Normal operation of the existing LondonEnergy Ltd EfW facility must be maintained during construction