Class 331 Heavy Maintenance infrastructure upgrade Allerton TCC

Northern Trains Limited

Value
£2,560,800
Published
3 Sept 2026
Deadline
5 Oct 2026
Procedure
Below threshold - open competition
Category
22314000 — Designs; 45000000 — Construction work
Location
UKD72, United Kingdom
Notice reference
083595-2026

Requirements summary

Northern Trains Limited is procuring design and construction works to upgrade the Allerton TCC depot with heavy maintenance infrastructure for its Class 331 fleet, centred on a vehicle jacking system and bogie change facilities on road 4. The programme must be completed, including EIS, handover and training, before 1 March 2028, with a contract period from December 2026 to March 2028 and a total gross value of GBP 2,560,800.

Key requirements

  • Design and build a vehicle jacking system capable of lifting 3 Class 331 vehicles synchronously without decoupling, also usable for single and two-car units
  • Interlock jacks with the Depot Protection system so rail movements are blocked unless jacks are stowed or birthed
  • Level and reinforce a 30m x 1.5m side-pit area on road 4 and validate floor loading and levelness through surveys
  • Provide storage for at least 12 bogies (clean and dirty segregated), with capacity for 16 explored, plus a covered battery forklift area with charging
  • Build concrete hardstanding at both shed ends and complete swept path and HAZID reviews for forklift operations
  • Complete all design, construction, EIS, handover and training before 1 March 2028, with a high-level programme submitted in tender