FW Supply & Deliver - 11kV Indoor Switchgear - Multi Site 0637
SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC
- Value
- £126,000,000
- Published
- 21 Sept 2026
- Deadline
- Not stated
- Procedure
- Competitive flexible procedure
- Category
- 31214500 — Electric switchboards; 31214000 — Switchgear; 31212000 — Circuit breakers; 31210000 — Electrical apparatus for switching or protecting electrical circuits
- Location
- UK, United Kingdom
- Notice reference
- 089302-2026
Requirements summary
Scottish Hydro Electric Power Distribution plc, on behalf of SSEN, is establishing multi-supplier Framework Agreements for the design, manufacture, testing, supply and delivery of 11kV indoor metal-enclosed primary switchgear across its distribution network. The Framework covers four lots (conventional and LPIT-enabled, fixed-pattern and withdrawable) and supports asset replacement, reinforcement, customer connections and investment through ED2, ED3 and early ED4. Forecast demand is about 2,600 switchgear panels, but volumes are indicative and no minimum is guaranteed.
Key requirements
- Design, manufacture, test, supply and deliver 11kV indoor metal-enclosed primary switchgear to SSEN Distribution network standards
- Supply in one or more of four lots: conventional CT/VT fixed-pattern, LPIT-enabled fixed-pattern, conventional CT/VT withdrawable, LPIT-enabled withdrawable
- Framework indicatively covers about 2,600 switchgear panels, with no minimum volume or value guaranteed
- Framework term from 1 July 2027 to 30 June 2035, with two optional 1-year extensions (maximum to 30 June 2037)
- Provide technical support, installation and commissioning support, training, warranty, spare parts and lifecycle support
- Demonstrate technical capability, product approval status or strategy, testing capability, UK support arrangements, and HS&Q management
- Demonstrate legal, financial and economic standing as set out in the procurement documents