Future Smart Metering Programme for AMP8 and Beyond

THAMES WATER UTILITIES LIMITED

Value
£1,584,000,000
Published
2 Nov 2026
Deadline
Not stated
Procedure
Competitive flexible procedure
Category
38421100 — Water meters; 50411100 — Repair and maintenance services of water meters; 65500000 — Meter reading service
Location
UKH, United Kingdom
Notice reference
103927-2026

Requirements summary

Thames Water Utilities Limited is procuring smart metering services for AMP8 and beyond, split into two lots. Lot 1 covers new and replacement meter installation, operations, customer-facing services and supporting data and workforce systems, valued at GBP 1.15bn net (GBP 1.38bn gross). Lot 2 covers operation and maintenance of the legacy smart meter communications estate, valued at GBP 170m net (GBP 204m gross). The initial term runs from 1 April 2028 to 31 March 2035, with extension options up to 31 March 2050.

Key requirements

  • Lot 1: end-to-end delivery of Smart Connected Customer as a Service, including planning, appointments and customer contact
  • Lot 1: meter supply, installation and replacement as assets reach end of life, plus communication networks and systems for the life of the assets
  • Lot 1: provide and operate data, work, workforce and customer management systems, with live appointment and job status APIs and data delivered to Thames Water's MDMS
  • Lot 2: operate and maintain legacy communication networks, firmware and head-end systems, and support legacy transition
  • Thames Water owns all data, including customer data, and may take full extracts or move capability in-house
  • Initial term from 1 April 2028 to 31 March 2035, with extension options by AMP period up to 31 March 2050
  • Selection through a PSQ with a deadline of 4 December 2026 at 12 noon, then up to 5 candidates per lot at second stage