Closed
ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
THE PIRBRIGHT INSTITUTE
- Value
- £185,000
- Published
- 6 Aug 2026
- Deadline
- 23 Sept 2026
- Procedure
- Below threshold - open competition
- Category
- 45000000 — Construction work; 45200000 — Works for complete or part construction and civil engineering work; 71247000 — Supervision of building work; 71311000 — Civil engineering consultancy services; 71311100 — Civil engineering support services; 71320000 — Engineering design services; 71322000 — Engineering design services for the construction of civil engineering works; 79415200 — Design consultancy services; 79933000 — Design support services
- Location
- UKJ25, United Kingdom
- Notice reference
- 074969-2026
Requirements summary
The Pirbright Institute in Woking is procuring a single supplier for civil building works and CDM Principal Designer/Principal Contractor services to replace the fumigation lobby in its ISO11 containment facility. The scope covers temporary biocontainment, strip-out, door and opening alterations, flooring and sealability works, a loading area, external staircase replacement, and an O&M handover, with an optional refurbishment of room G44. The estimated value is GBP 185,000 gross, with a contract period from 6 November 2026 to 5 October 2027.
Key requirements
- Single supplier for civil works and CDM Principal Designer and Principal Contractor roles for the ISO11 Fumigation Lobby Replacement Project
- Temporary biocontainment wall providing a bioseal, with works near it carried out to prevent damage
- Construction drawings from the structural engineer's drawings, plus liaison with the local authority on Building Control and site hosting
- Strip-out of the existing fumigation chamber and autoclave, and creation of a new fumigation lobby and loading/unloading areas with sealable, pallet-truck-friendly flooring
- New SR4 security-rated double doors, replacement external staircase for forklift access, and replacement plantroom doors
- Optional cost to refurbish room G44 so it can join ISO11, with sealable finishes and matching flooring
- Covered skip for waste held on site for 6 months before off-site disposal, and an O&M file with as-built drawings and Building Control completion certificates
- Tender due 23 September 2026 at 11:00 UTC; evaluation is 60% quality and 40% price
Similar open notices
- Romney Lock House - Internal Wall Insulation PIREnvironment Agency
- South East Wales Highways Framework Retender PME NoticeCardiff Council
- South East Wales Highways Framework Retender PME NoticeCardiff Council
- Herts, Beds & Bucks Development Framework - Gen2Chime Housing
- Herts, Beds & Bucks Development Framework - Gen2Chime Housing