Closed
Automatic Fire Detection and Associated Equipment Installation, Maintenance and Reactive Repair at Windsor and London Estates
The Royal Household
- Value
- £1,115,000
- Published
- 27 Aug 2026
- Deadline
- 2 Oct 2026
- Procedure
- Competitive flexible procedure
- Category
- 31625100 — Fire-detection systems; 31625200 — Fire-alarm systems; 45312100 — Fire-alarm system installation work; 45343000 — Fire-prevention installation works; 50413200 — Repair and maintenance services of firefighting equipment; 75251110 — Fire-prevention services
- Location
- London, UKI32, SW1A 1AA, United Kingdom
- Notice reference
- 081957-2026
Requirements summary
The Royal Household is procuring automatic fire detection and associated equipment installation, planned preventative maintenance, and reactive repair across Windsor Castle and Kensington Palace. The works cover fire alarm replacement at six named areas, with installation and commissioning to be completed within a fixed 3-year contract period, valued at GBP 1,115,000 with an option to extend by up to 2 years.
Key requirements
- Replace fire alarm systems at six areas: Windsor Castle Upper Ward, Middle and Lower Ward, Control Room, Mews, Home Park, and Kensington Palace (Main Palace, Ancillary Accommodation, Old Barracks)
- Complete installation and commissioning before the end of the fixed 3-year contract period
- Provide planned preventative maintenance and service contract for fire detection and alarm equipment
- Provide reactive repair services for fire detection and alarm equipment
- Work on listed and historic buildings and scheduled ancient monuments, many with public access, in secure installations
- Contract period 1 March 2027 to 1 March 2030, with an option to extend up to 1 March 2032
- Stage 1 Procurement Specific Questionnaire, with the top five suppliers taken to Stage 2 written bid and interview; registration on the Central Digital Platform is required
Similar open notices
- Passive Fire Protection Remedial Repairs at Abbey House, AbingdonVale of White Horse District Council
- Poplar HARCA Fire Remedial Works ContractPoplar HARCA
- Fire Protection Systems and Equipment MaintenanceMilton Keynes City Council
- Fire Protection Systems and Equipment MaintenanceMilton Keynes City Council
- Maintenance Services 2026YMCA St. Paul's Group