Boiler Room Upgrade at Kensington Palace

The Royal Household

Value
£325,000
Published
13 Nov 2026
Deadline
11 Dec 2026
Procedure
Below threshold - open competition
Category
42160000 — Boiler installations; 44621200 — Boilers; 45259900 — Plant upgrade work
Location
London, UKI32, SW1A 1AA, United Kingdom
Notice reference
107877-2026

Requirements summary

The Royal Household is procuring a boiler room upgrade at Kensington Palace, replacing end-of-life atmospheric gas boilers with high-efficiency condensing boilers and related heating plant. The works are valued at GBP 325,000, run as a below-threshold open competition, and have a tender deadline of 11 December 2026 with a contract period from 31 March 2027 to 30 June 2027.

Key requirements

  • Replace existing atmospheric gas boilers with new high-efficiency condensing boilers, including removal and disposal of old plant
  • Install new hot water cylinders, plate heat exchangers, pipework, valves and ancillaries
  • Survey, replace or reline existing boiler flues, and assess and upgrade the gas supply, including replacing mechanical gas drop valves with solenoid valves
  • Clean, flush and dose the existing heating system, and replace all thermostatic radiator valves and lockshield valves
  • Design the heating system to allow future connection to a district heat network
  • Provide testing, commissioning, certification, O&M manuals and handover documentation, plus builders' work and redecoration of the plant room
Boiler Room Upgrade at Kensington Palace — The Royal Ho… | ProposAI