Boiler Room Upgrade at Kensington Palace
The Royal Household
- Value
- £325,000
- Published
- 13 Nov 2026
- Deadline
- 11 Dec 2026
- Procedure
- Below threshold - open competition
- Category
- 42160000 — Boiler installations; 44621200 — Boilers; 45259900 — Plant upgrade work
- Location
- London, UKI32, SW1A 1AA, United Kingdom
- Notice reference
- 107877-2026
Requirements summary
The Royal Household is procuring a boiler room upgrade at Kensington Palace, replacing end-of-life atmospheric gas boilers with high-efficiency condensing boilers and related heating plant. The works are valued at GBP 325,000, run as a below-threshold open competition, and have a tender deadline of 11 December 2026 with a contract period from 31 March 2027 to 30 June 2027.
Key requirements
- Replace existing atmospheric gas boilers with new high-efficiency condensing boilers, including removal and disposal of old plant
- Install new hot water cylinders, plate heat exchangers, pipework, valves and ancillaries
- Survey, replace or reline existing boiler flues, and assess and upgrade the gas supply, including replacing mechanical gas drop valves with solenoid valves
- Clean, flush and dose the existing heating system, and replace all thermostatic radiator valves and lockshield valves
- Design the heating system to allow future connection to a district heat network
- Provide testing, commissioning, certification, O&M manuals and handover documentation, plus builders' work and redecoration of the plant room