Closed

Framework for the Provision of Electric Vehicle (EV) Charging Infrastructure and Managed Services

THE UNIVERSITY OF BIRMINGHAM

Value
Not stated
Published
1 Oct 2026
Deadline
12 Oct 2026
Procedure
Not stated
Category
51110000 — Installation services of electrical equipment
Location
UKG31, United Kingdom
Notice reference
093016-2026

Requirements summary

The University of Birmingham is running a preliminary market engagement for a single-contractor framework to provide, install, operate and support an integrated EV charging infrastructure and managed service across its campus. It covers migrating the existing 40-connector network across 33 charge points, adding 6 connectors in development, capturing fleet charging data, and an ongoing feasibility study, with a term of 1 January 2027 to 31 December 2029 plus an optional one-year extension to 31 December 2030. Responses are sought via expressions of interest, including case studies, views on operating models, and a feasibility study approach.

Key requirements

  • Design, supply, installation, commissioning and ongoing operation of EV charging across University car parks for staff, students and visitors
  • Migrate and consolidate existing 40-connector network across 33 charge points, plus 6 connectors in development, from current single-operator arrangement
  • Proactive, automated fault monitoring and response with improved network reliability
  • Capture and management of University fleet vehicle charging data
  • Ongoing feasibility study identifying growth, expansion sites, electrical capacity and income-generation opportunities
  • Include Edgbaston Park Hotel site EV charging requirement; framework term 1 Jan 2027 to 31 Dec 2029 with option to extend to 31 Dec 2030
  • EOI submission of three case studies, views on revenue share/concession or host-owned managed service models, and feasibility study approach

Similar open notices

Framework for the Provision of Electric Vehicle (EV) Ch… | ProposAI