Closed

Provision of Contingent Labour Services for Transport for Wales Infrastructure Maintenance Activities (Future Operating Model)

Transport for Wales (TFW)

Value
£5,500,000
Published
22 Sept 2026
Deadline
1 Oct 2026
Procedure
Not stated
Category
45100000 — Site preparation work; 45210000 — Building construction work; 45220000 — Engineering works and construction works; 45230000 — Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; 45300000 — Building installation work; 45400000 — Building completion work; 45500000 — Hire of construction and civil engineering machinery and equipment with operator; 50225000 — Railway-track maintenance services; 77211400 — Tree-cutting services; 77211500 — Tree-maintenance services
Location
UK, United Kingdom
Notice reference
089839-2026

Requirements summary

Transport for Wales (TfW) is developing a multi-lot framework agreement for contingent labour to supplement its directly employed workforce in delivering routine, planned, reactive and emergency Infrastructure Maintenance on the Core Valley Lines, ahead of its planned assumption of the Infrastructure Manager role in February 2028. The notice is at planning/preliminary market engagement stage with an estimated value of GBP 5.5m gross (GBP 4.6m net), a framework period starting September 2027 and a proposed end date of August 2030 with an extension option to August 2031. Lot structure remains subject to change after market engagement.

Key requirements

  • Contingent labour to supplement TfW's directly employed workforce for Infrastructure Maintenance on the Core Valley Lines
  • Provision of on-track (safety critical) and off-track maintenance labour, including protection staff, plant operators and electrification (OLE/OHLE) isolation staff
  • Short-notice and out-of-hours labour capability for routine, planned, reactive and emergency maintenance
  • Approved, compliant, competent and appropriately assured temporary maintenance labour providers
  • Framework to commence September 2027 to support mobilisation and operational readiness for February 2028 Infrastructure Manager transition
  • Proposed multi-lot structure (six potential lots) subject to change following supplier market engagement event on 5 October 2026 in Pontypridd

Similar open notices

Provision of Contingent Labour Services for Transport f… | ProposAI