Closed

33kV Substation SCADA Supply

UK Atomic Energy Authority

Value
£480,000
Published
21 Sept 2026
Deadline
6 Nov 2026
Procedure
Open procedure
Category
42961200 — Scada or equivalent system
Location
UKJ14, United Kingdom
Notice reference
089326-2026

Requirements summary

The UK Atomic Energy Authority is procuring a SCADA system for its 400/33kV substation at J5, Culham, to replace the existing CODAS, SCADA and PLC control setup. The scope covers design, manufacture, delivery, installation and commissioning of an IEC 61850-compliant, site-wide master SCADA with an operator workstation in the J5 control room, intelligent interlocking, and integration with all numerical and auxiliary devices.

Key requirements

  • Design, manufacture, delivery, installation and commissioning of a complete SCADA system at the J5 400/33kV substation
  • Full compliance with the IEC 61850 protocol
  • Decommissioning and replacement of the existing CODAS, SCADA and Programmable Logic Controllers
  • Operator workstation in the J5 control room with full control authority and intelligent interlocking
  • Integration with all numerical and auxiliary devices, transmitting alarms, trip signals and status indications over fibre or Ethernet to the main control room
  • Cyber Essentials certification as a selection criterion; contract period 1 January 2027 to 31 July 2032; evaluated 60% quality and 40% price

Similar open notices