Closed
Detailed design and build of a scaled down Fast Acting Low Conductance (FALCON)
United Kingdom Fusion Energy Ltd
- Value
- £240,000
- Published
- 17 Aug 2026
- Deadline
- 18 Sept 2026
- Procedure
- Open procedure
- Category
- 42131140 — Pressure-reducing, control, check or safety valves; 71320000 — Engineering design services; 73300000 — Design and execution of research and development
- Location
- UK, United Kingdom
- Notice reference
- 078272-2026
Requirements summary
United Kingdom Fusion Energy Ltd is procuring the detailed design and build of a scaled-down Fast Acting Low Conductance (FALCON) valve prototype. The prototype will protect the proposed exhaust vacuum pumping technology against disruption mitigation or sudden air ingress events for the STEP Prototype Powerplant, with the valve required to reach its closed position within 37.5 ms. The contract is valued at GBP 200,000 net (GBP 240,000 gross) and runs from October 2026 to October 2027.
Key requirements
- Detailed design and manufacture of a scaled-down FALCON isolation valve prototype
- Valve casing and actuation mechanism, with seals that maintain valve operation and vacuum integrity of the process gas line
- Fast-acting closure to the defined 'close' position within 37.5 ms
- Protection of exhaust vacuum pumping technology against disruption mitigation or sudden massive air ingress for the STEP Prototype Powerplant
- Contract period from 16 October 2026 to 16 October 2027; tender deadline 18 September 2026
- Open procedure; evaluated 60% technical, 30% price, 10% social value; SME suitability noted
Similar open notices
- Detailed design and build of a scaled down Fast Acting Low Conductance (FALCON)United Kingdom Fusion Energy Ltd
- Detailed design and build of a scaled down Fast Acting Low Conductance (FALCON)United Kingdom Fusion Energy Ltd
- Detailed design and build of a scaled down Fast Acting Low Conductance (FALCON)United Kingdom Fusion Energy Ltd
- Detailed design and build of a scaled down Fast Acting Low Conductance (FALCON)United Kingdom Fusion Energy Ltd
- Mission Feasibility Studies – Spacecraft Life Extension Service DemonstrationDepartment for Science, Innovation & Technology