PRO005084-Services-Framework-DNM Linear Monitor Installs

United Utilities Water Limited

Value
£30,000,000
Published
29 Sept 2026
Deadline
16 Dec 2026
Procedure
Competitive flexible procedure
Category
71700000 — Monitoring and control services; 32441200 — Telemetry and control equipment; 38810000 — Industrial process control equipment; 48610000 — Database systems; 50000000 — Repair and maintenance services; 50410000 — Repair and maintenance services of measuring, testing and checking apparatus; 50433000 — Calibration services; 51100000 — Installation services of electrical and mechanical equipment; 51210000 — Installation services of measuring equipment; 51230000 — Installation services of testing equipment; 51900000 — Installation services of guidance and control systems; 71631440 — Flow-monitoring services
Location
UKD, United Kingdom
Notice reference
091633-2026

Requirements summary

United Utilities Water Limited is seeking to appoint three delivery partners for the deployment of battery-powered level monitoring systems throughout the wastewater network. The project aims to roll out approximately 15,000 monitors over an initial three-year term, with a possibility to extend for an additional five years, including other sensing technologies.

Key requirements

  • Provision of approximately 15,000 battery-powered level monitors
  • Integration with existing telemetry systems and data platforms
  • Support for flow, pressure, rainfall, water quality, and asset condition monitoring
  • Responsibilities include hardware procurement, installation, and data acquisition
  • Suppliers must offer maintenance and lifecycle support
PRO005084-Services-Framework-DNM Linear Monitor Install… | ProposAI