GRIP 5-8 Delivery of Coventry South, Northampton CET and Tyseley Fuel Road 12

WM TRAINS LIMITED

Value
£36,600,000
Published
7 Sept 2026
Deadline
Not stated
Procedure
Competitive flexible procedure
Category
45234100 — Railway construction works; 45234112 — Railway depot construction work; 45234116 — Track construction works; 45234160 — Catenary's construction works; 45311000 — Electrical wiring and fitting work; 71311230 — Railway engineering services
Location
UKG33, United Kingdom
Notice reference
084519-2026

Requirements summary

WM Trains Limited is procuring rail depot and servicing works (GBP 36.6m total) across three lots: stabling and light maintenance at Coventry Carriage Sidings, a CET facility at Northampton Riverside, and a permanent embedded fuelling apron on Tyseley Road 12. The procurement is a competitive flexible procedure in two stages, with Stage 1 a Pre-Construction Services Agreement for GRIP 5 design and package pricing. Stage 2 (an NEC4 ECC lump-sum contract for GRIP 6-8) is not committed by the notice.

Key requirements

  • Stage 1 PCSA services: complete GRIP 5 design, further develop design, and price individual works packages per lot
  • Lot 1 Coventry: overnight stabling for up to ten 3-car Class 730 units, with CET, tanking, cleaning, lighting, security, OHLE, drainage and depot infrastructure works
  • Lot 2 Northampton Riverside: CET evacuation and train servicing facilities plus safe driver access in sidings A and B, for Class 730 units
  • Lot 3 Tyseley Road 12: permanent embedded track fuel apron with below-ground drainage, interceptors, canopy, CCTV, M&E, supporting up to 6-vehicle formations without splitting
  • Evaluation weighting of 35% price and 65% quality, including 10% social value; shortlist of 4 to 6 candidates per lot
  • Provisional contract period 1 June 2027 to 31 December 2027, subject to programme submissions and not guaranteed