OLE Monitoring for Class 730
WM TRAINS LIMITED
- Value
- £1,884,000
- Published
- 26 Aug 2026
- Deadline
- Not stated
- Procedure
- Direct award
- Category
- 60200000 — Railway transport services
- Location
- UKC, United Kingdom
- Notice reference
- 081212-2026
Requirements summary
WM Trains Limited plans a direct award for six OLE (overhead line equipment) monitoring systems for its Class 730 fleets, designed to be compatible with Class 350 fleets. The systems are intended to detect OLE faults early and send timely alerts to Network Rail to reduce infrastructure damage, delays, cancellations, and safety risks. The estimated value is GBP 1,570,000 excluding VAT (GBP 1,884,000 gross), with a planned contract period from 1 January 2027 to 31 December 2031 and a possible extension to 30 December 2034.
Key requirements
- Supply of 6 OLE monitoring systems for Class 730 fleets
- Systems must be compatible with Class 350 fleets
- Early identification of overhead line equipment faults
- Timely fault alerts to Network Rail
- Contract period 1 January 2027 to 31 December 2031, with renewal option to 30 December 2034
- Estimated value GBP 1,570,000 net (GBP 1,884,000 gross), procured by direct award under a planned notice